Hallo,
habe gerade erfolgreich drei Fanuc SPSen "down geloadet".
Kenne die SPS sonst nicht.
Die Meldung in der Diagnose ist:
CPU Diagnostic
--------------
PLC Fault Table (Displaying 9 of 9 faults, 0 Overflowed)
Loc (rack.slot) Fault Description Date/Time
0.0 Failed battery signal 01-01-98 16:52:25
0.0 Failed battery signal 01-01-98 16:47:24
0.0 Failed battery signal 01-01-98 16:46:46
0.0 Failed battery signal 01-01-98 16:45:31
0.0 Failed battery signal 01-01-98 16:38:13
0.0 Failed battery signal 01-01-98 16:38:02
0.0 Failed battery signal 01-01-98 00:00:02
0.0 Failed battery signal 12-30-1899 00:00:00
0.0 PLC CPU hardware failure 12-30-1899 00:00:00
Error Code Group Action Task Num
2 13 3:Fatal 0
Fault Extra Data: 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
IO Diagnostic
---------------
I/O Fault Table (Displaying 4 of 4 faults, 0 Overflowed)
Loc CIRC No. Ref. Address Fault Category Fault Type Date/Time
0.1 n/a %I 00017 Addition of exp unit Addition of exp unit 01-01-98 16:47:26
0.1 n/a %I 00017 Loss of exp unit Loss of exp unit 01-01-98 16:47:24
0.1 n/a %I 00017 Loss of exp unit Loss of exp unit 01-01-98 16:46:46
0.1 n/a %I 00017 Addition of exp unit Addition of exp unit 01-01-98 00:00:01
------------------------------
liest sich als "KISTE HINÜBER".
Kann mir bitte Jemand bewerten, ob Kiste hinüber - tauschen - richtig ist, oder ob es noch sinnvoll ist erste Hilfe zu leisten.
Gruss
Kurt
habe gerade erfolgreich drei Fanuc SPSen "down geloadet".
Kenne die SPS sonst nicht.
Die Meldung in der Diagnose ist:
CPU Diagnostic
--------------
PLC Fault Table (Displaying 9 of 9 faults, 0 Overflowed)
Loc (rack.slot) Fault Description Date/Time
0.0 Failed battery signal 01-01-98 16:52:25
0.0 Failed battery signal 01-01-98 16:47:24
0.0 Failed battery signal 01-01-98 16:46:46
0.0 Failed battery signal 01-01-98 16:45:31
0.0 Failed battery signal 01-01-98 16:38:13
0.0 Failed battery signal 01-01-98 16:38:02
0.0 Failed battery signal 01-01-98 00:00:02
0.0 Failed battery signal 12-30-1899 00:00:00
0.0 PLC CPU hardware failure 12-30-1899 00:00:00
Error Code Group Action Task Num
2 13 3:Fatal 0
Fault Extra Data: 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
IO Diagnostic
---------------
I/O Fault Table (Displaying 4 of 4 faults, 0 Overflowed)
Loc CIRC No. Ref. Address Fault Category Fault Type Date/Time
0.1 n/a %I 00017 Addition of exp unit Addition of exp unit 01-01-98 16:47:26
0.1 n/a %I 00017 Loss of exp unit Loss of exp unit 01-01-98 16:47:24
0.1 n/a %I 00017 Loss of exp unit Loss of exp unit 01-01-98 16:46:46
0.1 n/a %I 00017 Addition of exp unit Addition of exp unit 01-01-98 00:00:01
------------------------------
liest sich als "KISTE HINÜBER".
Kann mir bitte Jemand bewerten, ob Kiste hinüber - tauschen - richtig ist, oder ob es noch sinnvoll ist erste Hilfe zu leisten.
Gruss
Kurt