The packaging line is expanded with the years, also the S5 programma but not always in the good way, the programma is not very good, it works but that's all
We never do a S5 - S7 Conversion,
It will be a total new programme
I was just looking for some examples, tips for standard blocks for a converyor for example
i thought there maybe was some programming methode like for Proces/Batch installations , controle modules (ISA88)
I allready did an upgrade of a packaging line from S5 to S7 , but i was looking for some examples to see how it is been done elseware
I made a Standard block for a conveyor, i used a Function (Not a function block don't like the generating part, after a change in a block,) and i attach a Blocknumber as input,
With this blocknumber i make a pointer and with this pointer i load /save data to a Datablock
First network=
L Blocknumber
SLD3
T #Point
OPN DB_CONVEYOR_BITS
L DBW[#POINT]
T LW4
OPN DB_CONVEYOR_CNT
L DBW[#POINT]
T LW6
*****************
Conveyor programm
*****************
Last Network=
L Blocknumber
SLD3
T #Point
OPN DB_CONVEYOR_BITS
L LW4
T DBW[#POINT]
OPN DB_CONVEYOR_CNT
L LW6
T DBW[#POINT]
I just asked this question to learn some more , and improve my programming skills